An engineering contact for your project
From inputs to review decisions, agree on responsibilities and which decisions need your approval.
Working with the engineersFrom circuit reviews and BOM optimization to complete NPI support, CPS Lab helps you define each step from prototype to your first production run.
View Gerber ZIP/RAR on your device, toggle layers and check the file set. Native PCB is converted on the server when its format is available; temporary files are scheduled for deletion after 1 hour.
Online PCB & Gerber Converter Preview your files; DFM/DFA results require an engineer's review.Layer colours · fullscreen · zoom
A report should do more than list components. It should show where the data comes from, what remains uncertain, and what an engineer needs to confirm.
Explore the sample BOM reportGet support for a specific step or work with CPS Lab throughout the NPI process. Every package starts with an agreed scope.
Identify changes early, before ordering PCBs and starting assembly.
Clarify the component list, supply sources, and options requiring engineering approval.
Develop a working prototype into a design suitable for repeatable manufacturing.
An engineering plan from requirements or prototype to a pilot run with handover documentation.
Prepare structured documentation for engineering handover and the conformity assessment process.
Start with design modules that have clear documentation, versions, and terms of use.
Indicative prices are confirmed after a scope review. Estimated timelines begin when all required inputs are available and the schedule is agreed.
Every milestone has defined inputs, deliverables, and an approver. Changes are documented before the next step begins.
Share your design, the problem to solve, and your production goals.
Agree on deliverables, costs, and delivery milestones.
Review, design, and verify at each stage.
Deliver the documentation and confirm readiness for production.
Agree on the responsible engineer, review scope and handover criteria before work begins.
From inputs to review decisions, agree on responsibilities and which decisions need your approval.
Working with the engineersProjects in the Customer portal start private. You decide when to share your saved project with CPS Lab.
How we protect design filesA prototype, a set of files, or simply an engineering requirement.
Let's identify the next step together.